Komponen 1
Planning for flood risk management enhanced
1.A Enhanced basin data and information and preparation of flood risks management (FRM) plans for the 3 Cis RBT and Ambon–Seram RBT (BBWS 3 Cis and BWSM).
1.B Institutional strengthening, planning and coordination for the implementation of FRM plans in 3 Cis RBT and Ambon-Seram RBT (MOHA).
Komponen 2
Land management improved and flood infrastructure upgraded
2.A Farmland management and sustainable agriculture practices in the Ciujung river basin (MOA).
2.B Improved runoff and erosion control in 3 Cis RBT and Ambon-Seram RBT (MOHA).
2.C Detailed engineering design (DED) (including Environmental Impact Assessment (EIA), social safeguards, economic analysis, tender documents and river operation and maintenance plans) and Construction Supervision for the 3 Cis RBT and Ambon-Seram RBT (DGWR, BBWS 3 Cis and BWSM).
2.D Civil works for the 3 CIs and Ambon-Seram RBTs (Priority works, rehabilitation of flood control embankments, drainage system and associated control structures information) (BBWS 3 Cis and BWSM).
Komponen 3
Capacity for community-based flood risk management (CBFRM) enhanced
3.A Enhanced capacity for community-based flood risk management in the 3 Cis RBT and Ambon-Seram RBT (MOHA).
Komponen 4
Policy, coordination and capacity at the national level improved
4.A Project Management (DGWR-MPWH).
4.B Independent Monitoring, Evaluation (IME) and Strategic Coordination (SC) BAPPENAS.